The checklist stands as so (all-inclusive before and after check list because I know all you really care about are pictures):
finish the bathroom vanity topinstall the bathroom sink- paint the trim in the bathroom
install sconces,towel bar, etc.fix hardwood floor in kitcheninstall the last 3 cabinetstile the kitchen floor- have counter top installed
- install appliances
Out of those nine items we have checked off six big ones! Holy sheet!rock! We have also set a firm goal date of the end of November to be moved into the red hizzy ... or so we hope. The kitchen floor is tiled. As in no longer can you see the horridness that was red tile or green asbestos vinyl tile or rotted sub floor.
Need I say more? |
Lookin' good! |
In bathroom news...Wait. What's that? You want to see more pictures demonstrating how the kitchen looked before we kicked its sorry ass and after? Sure! I'd be happy to oblige.
Ugh. |
Ah. Yea. That seriously is the same kitchen. |
Anyway... some doodads in the bathroom need a do over and yes those are totally a technical terms. For some reason my spidy senses were off a little when planning the bathroom. The fixes are 100% cosmetic and while the manly men are installing the appliances this weekend I will have my way with the bathroom (get your minds out of the gutter thankyouverymuch). I cannot believe Thanksgiving is upon us already. What is everyone doing? Anyone hitting up black friday?